GROVER WILLIAMS JR
29491 Rancho California Road Suite 654, Temecula, CA 92591 | O: (951)365-0242 C: (205)542-3350|gwjr@bjjandjconsultant.com
Summary
Civil and Transportation Engineering experience
Bridge Design
Light Rail Transit Design
Rail Design
Roadway Design
Highway Design
Site Design
Miscellaneous Designs
Highlights
29491 Rancho California Road Suite 654, Temecula, CA 92591 | O: (951)365-0242 C: (205)542-3350|gwjr@bjjandjconsultant.com
Summary
Civil and Transportation Engineering experience
Bridge Design
Light Rail Transit Design
Rail Design
Roadway Design
Highway Design
Site Design
Miscellaneous Designs
Highlights
Project Management
|
Project DESIGN
|
Accomplishments
Light Rail Transit
Project Manager/Construction Manager September 2017 to May 2019
BJJ&J Consultant - Temecula, California
Purple Line- Los Angeles, CA (Construction Manager)
Roadways/Water/Bridges/Rail/Site Development/Miscellaneous Designs
Roadways/Water
Project Manager/Construction Manager September 2017 to June 2018
BJJ&J Consultant - Temecula, California
SDCWA Pipeline 3 Relining- San Diego, CA (Construction Manager)
Light Rail Transit
Construction Manager/Project Manager Mar 2014 to Mar 2015
Stantec Consulting - Los Angeles, CA
Crenshaw/LAX Transit Corridor- Los Angeles, CA (Construction Manager)
Roadways/Structural
Project Manager/Project Designer Apr 2012 to Apr 2013
Stantec Consulting - Edmonton, Alberta, Canada
Mr. Williams was Transportation Project Manager and Project Designer at Stantec Consulting. His project experiences with roadways and structures are described below:
Highway 628:04 Twinning - Sherwood Park, AB Canada (Project Manager)
3 Ave Ext. & Hwy 824 Upgrades - Ardrossan, AB Canada (Project Manager)
Broadview Road Extension - Sherwood Park, AB Canada (Project Manager)
Hwy 2:62 & Hwy 743:02 Design - Peace River, AB Canada (Project Manager)
Light Rail Transit Design/Rail Design
Mr. Williams was a Rail Designer/Project Manager at Stantec Consulting. His project experiences with Rail Design are described below:
Alderon Kami Iron Ore Project- Wabush, Labrador City in Western Labrador, Canada (Rail Designer)
CN Edmonton IM Grading, Edmonton, AB Canada (Rail Designer)
Loadout Study-CN Lynton Yard - Wood Buffalo, AB Canada (Rail Designer)
Battum ASP Facility (Rail Designer)
Roadways/Structures/Bridges/Site Development/Miscellaneous Designs
Project Manager/Designer Consultant May 2008 to Apr 2012
BJJ&J Consultant - Atlanta, Georgia
Roadways
Project Designer/Project Manager Mar 2005 to Apr 2008
Stantec Consulting - Atlanta, Georgia – Irvine, CA – Ontario, CA
Mr. Williams was Transportation Project Manager and Project Designer at Stantec Consulting. His project experiences with roadways are described below:
State of Georgia Department of Transportation Forest Hill Road Macon, Georgia (Project Manager)
State of Georgia Department of Transportation Jeffersonville Road Macon, Georgia (Project Manager)
State of California Caltrans Department of Transportation Project Development I-10 San Bernardino, California (Project Engineer)
Diamond Jamboree Plaza City of Irvine Street Improvements Irvine, California (Project Manager)
City of Inglewood Street Improvements Inglewood, California (Project Engineer)
City of LA Street Improvements Los Angeles, California (Project Engineer)
Project Engineer for street improvements along Inglewood/Culver Boulevard.
Project Engineer for street improvements along Centinela/Culver Boulevard.
Culver City Street Improvements Culver City, California (Project Engineer)
New Model Colony Riverside Drive Street Improvements Ontario, California (Project Engineer)
Roadways/Water
Civil Engineering Designer/Project Manager Mar 2002 to Mar 2005
FPL and Associates - Irvine, California
Mr. Williams was Transportation Project Manager and Designer at FPL and Associates. His project experiences with roadways and water are described below:
IRWD Waterline Jeffrey Road Irvine, California (Project Manager)
City of Glendale San Fernando Road Landscape Improvements Phase I & II Glendale, California (Project Designer)
MTA San Fernando Bus Rapid Transit BRT San Fernando, California (Project Designer)
Riverside County Silver Hawk Road Improvements Riverside, California (Project Designer)
Light Rail Transit Design
Mr. Williams was a Civil Engineering Designer at FPL and Associates. His experience includes Structural Design, Site Design, Highway Design, Traffic Studies, Planning, Design of Drainage System, Site Development, and signing & striping. He used MicroStation/InRoads as his designing tools. His project experience with light rail transit is described below:
State of Colorado I-25 & 225 T-REX Denver, Colorado (Project Engineer)
Bridges
Project Manager/Designer Jan 2000 to Mar 2002
BJJ&J Consultant – Birmingham, AL
Mr. Williams experience includes Structural Design, Site Design, Highway Design, Traffic Studies, Noise Studies, Demolition Plans, Planning and Design of Drainage System, and Site Development. His project experiences with bridges are described below:
Sipsey Fork/Highway 69 Walker-Cullman County, Alabama; Baker Creek/Highway 269 Walker County, Alabama; Champion Creek/SR 75 Blount County, Alabama; Unnamed Branch/SR 23 St. Clair County, Alabama; SR 68 Over Mill Creek Cherokee County, Alabama (Project Manager)
Education
Civil Engineering
University of Alabama - Birmingham, AL, USA (30 hr’s to complete Bachelor’s Degree.)
Skills
Certifications
California Unified Certification Program (CUCP)
JOSHUA WILLIAMS-ESEVICH
1090 Main St Apt 306. Redwood City (205) 902-3109 joshwill131@gmail.com
Reliable, organized, and motivated Construction Estimator who has great experience and delivers accurate and timely estimates.
Education
The University of Alabama | Tuscaloosa, AL | 2016
Bachelor of Science in Civil Engineering
Experience
BJJ&J Consultant | Temecula, CA | May 2014 - July 2016 (Summer Internship)
Civil Engineering Intern -- primarily focused on sound monitoring and reporting, construction inspections and reports, and site development work.
The University of Alabama | Tuscaloosa, AL | January 2016 - May 2016
Senior Design Project Team Lead -- led team of peers in the design, site plans, floor plans, detailing, and rendering of The Strandin-Hardin Arena for senior building design project. This project is an ADA Facility for Alabama’s Wheelchair Basketball Team.
BJJ&J Consultant | Redwood City, CA | March 2020 – May 2021
Construction Cost Estimator – Executed quantity take-offs on Schematic & Construction Phases for some of the most iconic buildings/landmarks in the United States.
RMA Group | San Jose, CA | July 2020 – May 2021
Staff Engineer – Quality Control Engineer for several Public Works projects. Responsible for all reports to the project owners, estimate for project bids and managed materials lab.
Citidev | San Francisco, CA | May 2021 – Current
Estimator – Works closely with architects and owners to produce timely, accurate and competitive estimates for high-end residential construction. Manage/grow sub-contractors & vendors. Provide project support, material orders, value engineering, allowance tracking, and improve estimating systems
Technical Skills
Experience with AutoCAD Civil 3D, Bluebeam, Adobe Acrobat, Co-Construct, Smartsheet, Excel, LIMS, Salesforce and REVIT
Other
CPR and AED Certified, Math Tutor/Mentor. My Interests include playing the guitar, hiking, long-barding, traveling, learning Spanish and watching Alabama Football.
- Owner of BJJ&J Consultant, a Small Business owned Civil Engineering Consultant specializing in Transportation Engineering Services and Construction Management Services.
- Certified with California Unified Certification Program (CUCP) D-U-N-S # 826040417 DBE #42675 SBE Metro File #6816 Los Angeles County Metropolitan Transportation Authority (LACMTA) Vendor #107611.
- Certified with The State of California Certifications Department of General Services > SB - #1796019 - Small Business Active Certification APP > April 7, 2022, to April 30, 2024.
- Certified with North County Transit District (NCTD) Roadway Worker Protection (RWP)#E0921 ALSTOM Coaster/Sprinter Issue Date: Aug 27, 2021, to Sept 1, 2022.
- Certificates: Acoustics of Highway Traffic and Construction Noise, Highway Traffic and Construction Noise Regulations, How to Document Highway Traffic Noise Study Results, How to Measure Highway Traffic Noise, H2S Alive Enform Safety Association for Canada's Upstream Oil and Gas Industry, Ground Disturbance Level II Certificate, Alberta Construction Safety Association Certificate, Turner School of Construction Management Certificate, Environmental Risk Management Certificate, How to Read and Analyze Financial Statements Certificate, Schedule Development Certificate, Gas Tester and Tunnel Safety Orders.
- Very proficient in MicroStation Select Series 4\Power Inroads SS4 OpenRoads Technology V8i, AutoCAD MEP 2017, Civil 3D 2017, Revit 2016, Revit MEP 2017, and Revit Structural 2017.
- His planning, design, and construction efforts create and support the infrastructure that effectively moves people and goods.
- His experience with structures, storm water, water, railways, bridges, highways, rural roads, urban streets, urban land, toll roads, site development and multi-modal systems encompasses every conceivable climate and terrain.
- His transportation specialties are enhanced by an array of environmental, geotechnical, and land survey/geomatics expertise, while his landscaping qualities add value and beauty to North America’s byways.
- He manages the project development process proactively - Recognizing that successful projects require more than just good technical solutions - It must be sustainable economically, socially, and environmentally – With the ability to work with clients and stakeholders, to achieve that while supporting cost-effective solutions.
- His approach, along with a healthy dose of pragmatism developed through the involvement in many projects in every conceivable climate and terrain, provide the clients with designs that meet current and projected needs in a cost-effective and sensitive manner.
Light Rail Transit
Project Manager/Construction Manager September 2017 to May 2019
BJJ&J Consultant - Temecula, California
Purple Line- Los Angeles, CA (Construction Manager)
- Working as a consultant for Los Angeles County Metropolitan Transportation Authority.
- Coordinate with a team of consultants to manage the construction of the project.
- This project consists of a new Rail Line connecting from existing Wilshire/Western and extend westward for about nine miles with seven new stations.
- Provide All Construction Noise Compliance Monitoring Issues-Stormwater Site Compliance Issues.
- Construction Supervisor.
- Tunnels
Roadways/Water/Bridges/Rail/Site Development/Miscellaneous Designs
Roadways/Water
Project Manager/Construction Manager September 2017 to June 2018
BJJ&J Consultant - Temecula, California
SDCWA Pipeline 3 Relining- San Diego, CA (Construction Manager)
- Working as a consultant for San Diego County Water Authority.
- Coordinate with a team of consultants to manage the construction of the project.
- This project consists of relining existing untreated prestressed concrete pipe from Lake Murray to Sweet-water Reservoir.
- Provide All Construction Traffic Control Inspection & Paving Inspection.
Light Rail Transit
Construction Manager/Project Manager Mar 2014 to Mar 2015
Stantec Consulting - Los Angeles, CA
Crenshaw/LAX Transit Corridor- Los Angeles, CA (Construction Manager)
- Worked as a consultant for Los Angeles County Metropolitan Transportation Authority.
- Coordinated with a team of consultants to manage the construction of the project.
- This project consists of a new Rail Line connecting from existing Expo Line to LAX.
- Provided disposition to Document Control for All Construction Work Plans.
Roadways/Structural
Project Manager/Project Designer Apr 2012 to Apr 2013
Stantec Consulting - Edmonton, Alberta, Canada
Mr. Williams was Transportation Project Manager and Project Designer at Stantec Consulting. His project experiences with roadways and structures are described below:
Highway 628:04 Twinning - Sherwood Park, AB Canada (Project Manager)
- Provided Construction Supervision, Contract Administration and Post Construction for this Alberta Transportation Project.
- Hwy 628:04 Intersection Improvement at Jct. Hwy 628 and Range Road 233 kilometer 1.140 To 1.820.
- This project included Grading, Granular Base Course, Asphalt Concrete Pavement, Cutting of Pavement, Street Lighting, Traffic Signals, Line Painting, Signing, Utilities and Other Work related to this project.
- Provided Final Details Package for Alberta Transportation.
- This included all Bid Item quantities and as built using MicroStation/InRoads and provided End Area Volume for earthwork quantities to Alberta Transportation.
3 Ave Ext. & Hwy 824 Upgrades - Ardrossan, AB Canada (Project Manager)
- Provided Construction Supervision and Contract Administration for Strathcona County.
- This project involves the design, stakeholder consultation, tender preparation, tender review, construction supervision, contract administration, and post construction services for the relocation of the Range Road 221A/Highway 824 intersection north to intersect with an extension of the existing Third Avenue in the town of Ardrossan.
Broadview Road Extension - Sherwood Park, AB Canada (Project Manager)
- Provided Construction Supervision and Contract Administration for Strathcona County.
- This project involves the design, stakeholder consultation, tender preparation, tender review, construction supervision, contract administration, and post construction services for the Broadview Road from 100m east of Broadview Drive to the Truck Sewer Pipeline Right-of-Way.
Hwy 2:62 & Hwy 743:02 Design - Peace River, AB Canada (Project Manager)
- Provided Final Details Package for Alberta Transportation, this included all Bid Item quantities using MicroStation/InRoads and provided End Area Volume for earthwork quantities to Alberta Transportation.
- This project included Preliminary Engineering, Detailed Design and Tender Package.
- Preparation for Grading, Granular Base Course (GBC), Asphalt Concrete Paving (ACP), Service Road Construction, Bridge Culvert Installation, Relocated Utilities and Other Work related to this project.
Light Rail Transit Design/Rail Design
Mr. Williams was a Rail Designer/Project Manager at Stantec Consulting. His project experiences with Rail Design are described below:
Alderon Kami Iron Ore Project- Wabush, Labrador City in Western Labrador, Canada (Rail Designer)
- This project involves moving over eight (8) million metric tonnes of iron ore concentrated from the mine (near Labrador City) to the Port of Sept Iles facilities at Pointe Noire, Quebec. Prepared Plans for this Alderon Iron Ore Rail Planning and Feasibility Study.
- This includes Rail system alignments, existing/proposed surfaces, Cross-Sections and Horizontal & Vertical Profiles.
- These plans were developed using MicroStation/InRoads.
CN Edmonton IM Grading, Edmonton, AB Canada (Rail Designer)
- This project involved all aspects of railroad design including architecture, landscape architecture, structural engineering, drainage and utility engineering, systems engineering, and signals and communications design.
- This includes Rail system alignments, existing/proposed surfaces, right-of-way, Cross-Sections and Horizontal & Vertical Profiles.
- These plans were developed using MicroStation/InRoads.
Loadout Study-CN Lynton Yard - Wood Buffalo, AB Canada (Rail Designer)
- This project includes Rail system alignments, existing/proposed surfaces, right-of-way, Cross-Sections and Horizontal & Vertical Profiles.
- These plans were developed using MicroStation/InRoads.
Battum ASP Facility (Rail Designer)
- This project includes Rail system alignments, existing/proposed surfaces, right-of-way, Cross-Sections and Horizontal & Vertical Profiles.
- These plans were developed using MicroStation/InRoads.
Roadways/Structures/Bridges/Site Development/Miscellaneous Designs
Project Manager/Designer Consultant May 2008 to Apr 2012
BJJ&J Consultant - Atlanta, Georgia
- His experience includes Structural Design/Site Design/Highway Design.
- Traffic Studies and Noise Studies.
- Demolition Plans.
- Planning and Design of Drainage System.
- Site Development.
- Manager of Alabama Department of Transportation projects.
- He used MicroStation/InRoads Stormworks and HY-8 as his designing tools.
Roadways
Project Designer/Project Manager Mar 2005 to Apr 2008
Stantec Consulting - Atlanta, Georgia – Irvine, CA – Ontario, CA
Mr. Williams was Transportation Project Manager and Project Designer at Stantec Consulting. His project experiences with roadways are described below:
State of Georgia Department of Transportation Forest Hill Road Macon, Georgia (Project Manager)
- Provided design services for street improvements along Forest Hill Road.
- Prepared plans for Final Field Plan Review, Quality Assurance/Quality Control, and other documents as required.
- This was a widening project for approximately 2.2 km of roadway Improvements included drainage systems, alignments, side roads, existing/proposed surfaces, and drainage profiles.
- This also included quantities for drainage, roadway, erosion control, landscaping, irrigation, roadway lighting, traffic signals, and signing/striping.
- I provided guidance for the preparation of right-of-way plans, construction staging plans, and utilities plans.
- Also included was the coordination with GDOT, and the use of MicroStation for this project.
State of Georgia Department of Transportation Jeffersonville Road Macon, Georgia (Project Manager)
- Provided design services for street improvements along Jeffersonville Road.
- Prepared plans for Preliminary Field Plan Review, Quality Assurance/Quality Control, and other documents as required.
- This was a widening project for approximately 1.4 km of roadway with a concrete spillway and rail overpass.
- Improvements included drainage systems, alignment, side roads, existing/proposed surfaces, and drainage profiles.
- This also included quantities for drainage, roadway, erosion control, traffic signals, and signing/striping.
- I provided guidance for the preparation of right-of-way plans, construction staging plans, and utilities plans.
- Also included was the coordination with GDOT, and the use of MicroStation for this project.
State of California Caltrans Department of Transportation Project Development I-10 San Bernardino, California (Project Engineer)
- Provided design services for drainage plans for approximately 14 miles of Interstate along I-10 east/west bound.
- Improvements included drainage systems, drainage profiles, and drainage quantities.
- This included centerline alignment, system alignments, existing/proposed surfaces, right-of-way, off/on-ramps, and overside drains.
- Also included was the coordination with Caltrans, hawkeyed like QA/QC, and the use of MicroStation/InRoads.
Diamond Jamboree Plaza City of Irvine Street Improvements Irvine, California (Project Manager)
- Provided design services for street improvements along Alton Parkway.
- Improvements included widening to accommodate a right turn lane, a parabolic raised median along EB Alton Parkway, and two left turn pockets.
This project also included right-of-way, sidewalk, curb-and-gutter, access ramps, parking, drainage, driveways, bike lanes, and signing/striping.
City of Inglewood Street Improvements Inglewood, California (Project Engineer)
- Engineer for street improvements along La Brea Avenue-Improvements included signing and striping plans.
- Cost estimate, and bid packages were also included.
City of LA Street Improvements Los Angeles, California (Project Engineer)
- Project Engineer for street improvements for Culver Boulevard- Improvements included widening for right turn lane with curb-and-gutter, plus a bus pad and curb ramps.
- Project also included signing, striping, traffic signals, traffic control, lighting, utilities and pollution prevention plans.
- Cost estimate and bid packages were also included.
Project Engineer for street improvements along Inglewood/Culver Boulevard.
- Improvements included 450' transitional widening including a right turn lane and right turn transition lane with curb-and-gutter, curb ramps, and sidewalks.
- Project also included signing, striping, traffic signals, traffic control, lighting, utilities and pollution prevention plans.
- Cost estimate and bid packages were also included.
Project Engineer for street improvements along Centinela/Culver Boulevard.
- Improvements included widening from 30' to 35' with curb-and-gutter, curb ramps, sidewalks, plus relocated bus pads, catch basins and extended the existing pipes on both sides of Centinela/Culver Boulevard.
- Project also included drainage design, signing, striping, overhead signs, driveway profiles, survey, traffic signals, traffic control, lighting, utilities and pollution prevention plans.
- Cost estimate and bid packages were also included.
Culver City Street Improvements Culver City, California (Project Engineer)
- Project Engineer for street improvements along Washington Place and Sawtelle Boulevard.
- Improvements included widening for right turn lanes with curb-and-gutter plus relocated the catch basins and extended the existing pipes on both sides of Sawtelle Boulevard and Washington Place.
- Project also included drainage design, signing/striping, traffic signals, lighting, and pollution prevention plans.
- Cost estimate and bid packages were also included.
New Model Colony Riverside Drive Street Improvements Ontario, California (Project Engineer)
- Responsible for design of roadway improvements of approximately 3 miles of Riverside Drive from Hellman Avenue to Milliken/Hamner Avenue.
- Improvements included widening, with curb-and-gutter, raised medians, sidewalks, wheelchair ramps, and driveway approaches.
- This included centerline alignment, right-of-way, dedications/conflict plats, storm sewer, intersections, and domestic/recycled water, grading, lighting, signing/striping, and summary of quantities.
- QA/QC was also included.
Roadways/Water
Civil Engineering Designer/Project Manager Mar 2002 to Mar 2005
FPL and Associates - Irvine, California
Mr. Williams was Transportation Project Manager and Designer at FPL and Associates. His project experiences with roadways and water are described below:
IRWD Waterline Jeffrey Road Irvine, California (Project Manager)
- Conducted traffic control design for Irvine Water Department.
- This was a waterline construction project.
- Improvements included the preparation and review of traffic studies along Jeffrey Road.
- This project also included traffic control, construction management and construction staging, plan and profile plans.
City of Glendale San Fernando Road Landscape Improvements Phase I & II Glendale, California (Project Designer)
- Conducted grading, drainage, and utility design for improvements along San Fernando Road.
- Improvements included right-of-way, sidewalk, curb-and-gutter, access ramps, drainage, driveways, bike lanes, and signing/striping.
- This project also included the preparation and review of traffic studies.
- Cost estimate and bid packages were also included.
MTA San Fernando Bus Rapid Transit BRT San Fernando, California (Project Designer)
- Provided design services for street improvements for San Fernando Bus Transit.
- Improvements included widening, right & left turn lanes, and intersection for bus routes along Water Canyon Road.
- Improvements included right-of-way, sidewalk, curb-and-gutter, access ramps, drainage, driveways, bike lanes, and signing/striping.
- Cost estimate and bid packages were also included.
Riverside County Silver Hawk Road Improvements Riverside, California (Project Designer)
- Conducted median improvements and striping design for Silver Hawk Road in Riverside County.
- Improvements included raised median, drainage, landscape, and signing/striping.
Light Rail Transit Design
Mr. Williams was a Civil Engineering Designer at FPL and Associates. His experience includes Structural Design, Site Design, Highway Design, Traffic Studies, Planning, Design of Drainage System, Site Development, and signing & striping. He used MicroStation/InRoads as his designing tools. His project experience with light rail transit is described below:
State of Colorado I-25 & 225 T-REX Denver, Colorado (Project Engineer)
- Responsible for the signage and pavement delineation, of a $1.67 billion venture that had a goal of transforming the way people in the metro Denver area commute within the areas of Interstates 25 and 225, then the country's 14th busiest intersection.
- The T-REX effort widened major interstates to as much as 7' wide in each direction and added 19 miles (31 km) of double-track light rail throughout the metropolitan area (40 miles’ total).
- It's considered by some to be one of the most successful transportation upgrade projects in the United States.
- The T-REX project finished 3.2% under its $1.67B budget and 22 months ahead of schedule in 2006 and is an example of inter-governmental agency cooperation for transportation projects for North America and Worldwide.
- Stakeholders have been recognized nationally and internationally for its success, including quality management.
Bridges
Project Manager/Designer Jan 2000 to Mar 2002
BJJ&J Consultant – Birmingham, AL
Mr. Williams experience includes Structural Design, Site Design, Highway Design, Traffic Studies, Noise Studies, Demolition Plans, Planning and Design of Drainage System, and Site Development. His project experiences with bridges are described below:
Sipsey Fork/Highway 69 Walker-Cullman County, Alabama; Baker Creek/Highway 269 Walker County, Alabama; Champion Creek/SR 75 Blount County, Alabama; Unnamed Branch/SR 23 St. Clair County, Alabama; SR 68 Over Mill Creek Cherokee County, Alabama (Project Manager)
- Managed Alabama Department of Transportation projects providing services for highway design and drainage design.
- These are bridge replacement projects which included relocation, grading, drainage, base/pave, signing/striping, utilities and lighting. Improvements also included drainage systems, drainage profiles, drainage quantities which included centerline alignment, system alignments, existing/proposed surfaces, and right-of-way.
- He also coordinated with ALDOT and used MicroStation/InRoads as his designing tools.
Education
Civil Engineering
University of Alabama - Birmingham, AL, USA (30 hr’s to complete Bachelor’s Degree.)
Skills
- MicroStation SS4
- Power Inroads SS4 OpenRoads Technology V8i
- AutoCAD MEP 2017
- Civil 3D 2017
- Revit 2016
- Revit MEP 2017
- Revit Structural 2017
- Microsoft Office
- Adobe Acrobat XI Pro
- Primavera
Certifications
California Unified Certification Program (CUCP)
- D-U-N-S - # 826040417
- METRO Vendor - #107611
- DBE - #42675
- SBE - #6816
- 541340 > Drafting Services
- 541611 > Administrative Management and Management Consulting Services.
- SB - #1796019
- SB Active Certification APP > May 7, 2020 to May 31, 2022 >
- 801016 > Project Management
- 801615 > Management Support Services
- 811015 > Civil Engineering
- 811022 > Transportation Engineering
JOSHUA WILLIAMS-ESEVICH
1090 Main St Apt 306. Redwood City (205) 902-3109 joshwill131@gmail.com
Reliable, organized, and motivated Construction Estimator who has great experience and delivers accurate and timely estimates.
Education
The University of Alabama | Tuscaloosa, AL | 2016
Bachelor of Science in Civil Engineering
- Member of UA Civil, Construction & Environmental Engineering Alumni
- Environmentalist at Black Warrior Riverkeeper
- Coached at Alabama Gymnastics Camp
Experience
BJJ&J Consultant | Temecula, CA | May 2014 - July 2016 (Summer Internship)
Civil Engineering Intern -- primarily focused on sound monitoring and reporting, construction inspections and reports, and site development work.
- Inspected and installed sound monitoring devices on multiple sites.
- Analyzed Monitoring results
- Prepared and submitted construction noise compliance reports to LA County MTA.
- Developed and issued noise monitoring schedules.
The University of Alabama | Tuscaloosa, AL | January 2016 - May 2016
Senior Design Project Team Lead -- led team of peers in the design, site plans, floor plans, detailing, and rendering of The Strandin-Hardin Arena for senior building design project. This project is an ADA Facility for Alabama’s Wheelchair Basketball Team.
- Drafted and rendered all plans for overall building design.
- Analyzed and developed life safety plans for the project within all state and federal codes.
- Consistently evaluated and adjusted project details to ensure accuracy and timeliness in completion of milestones.
- Surveyed and analyzed data for site selection.
BJJ&J Consultant | Redwood City, CA | March 2020 – May 2021
Construction Cost Estimator – Executed quantity take-offs on Schematic & Construction Phases for some of the most iconic buildings/landmarks in the United States.
- Calculated total rebar/concrete quantity for LA County Museum of Arts
- Performed quantity takeoffs for LA County Museum of Arts on gross areas, interior walls, and finishes.
- Performed quantity takeoffs for FORD’s manufacturing facility on gross areas, interior walls, and finishes.
- Performed quantity takeoffs on signage for Sunnyvale Civic Center.
- Performed quantity takeoffs for PSU Liberal Art Building on gross areas, interior walls, ceilings, flooring, finishes, and exterior glazing.
- Performed quantity take-off on schematic drawings B25A and Bayview.
RMA Group | San Jose, CA | July 2020 – May 2021
Staff Engineer – Quality Control Engineer for several Public Works projects. Responsible for all reports to the project owners, estimate for project bids and managed materials lab.
- Submit documents to owner of SFMTA Van Ness Infrastructure project – performed contractor quality control reports, density reports, three phase meetings, pre-pour checklist, quality control checklist, material inspections and monthly quality control reports.
- Submit documents to owner of 19th St BART improvement – performed monthly quality control reports, daily reports, non-conformance reports and material inspection reports.
- Submit Close-out documentation to owner of Silicon Valley Clean Water Front of Plant – managed daily reports, concrete break reports, density reports, mill certs, fusion test, pressure test and pre-pour checklist
- Submit Change Orders to Contractors
- Performed Material Inspections and verified materials per submittals
Citidev | San Francisco, CA | May 2021 – Current
Estimator – Works closely with architects and owners to produce timely, accurate and competitive estimates for high-end residential construction. Manage/grow sub-contractors & vendors. Provide project support, material orders, value engineering, allowance tracking, and improve estimating systems
- Produced estimate and rewarded new construction at 14 Peninsula Ave and provide information/estimates for preconstruction and value engineering.
- Coordinates with municipalities and architects for permits/information.
- Coordinates with suppliers, vendors, and sub-contractors to ensure material order delivery time
- Manages bid request packages, RFIs, submittals and material logs.
- Produced estimate and rewarded remodel of 2442 Great Hwy apt complex and provided project support to previous scope of work.
- Grow and maintain the companies master-cost database
- Produced estimate and rewarded new ADU of 301 Arkansas St
- Estimated and bid up to twenty high-end remodel projects and rewarded 8 projects in the bay area.
- Estimated and bid up 5 new construction projects and rewarded 2 in the bay area.
Technical Skills
Experience with AutoCAD Civil 3D, Bluebeam, Adobe Acrobat, Co-Construct, Smartsheet, Excel, LIMS, Salesforce and REVIT
Other
CPR and AED Certified, Math Tutor/Mentor. My Interests include playing the guitar, hiking, long-barding, traveling, learning Spanish and watching Alabama Football.